For commercial & industrial facilities

Commercial Water Management That Lowers Your Utility Bills

Our Flow Conditioning Device stops your water meter from over-reading. Most facilities cut water and sewer bills 5-30%, starting on the next billing cycle.

  • Cut water and sewer bills 5-30% with no change to operations
  • Savings show up on your very next billing cycle
  • 90% of customers reach ROI in under 12 months

IAPMO, NSF, ANSI/CAN 61, KIWA, GMP and SQF certified. Made in USA.

Prefer to talk? Call 1-(844)-934-8258

commercial water management

Get your free water bill review

Tell us about your facility. We review your water and sewer bills and show your savings range at no cost.

What kind of property or facility are you looking at?

Your details go only to Water Flow Innovation to answer your request. No spam. Privacy policy

5-30%Average water and sewer bill reduction
46%Highest documented bill reduction
90%Reach ROI in under 12 months
~1 hourTypical installation time

Why facility teams choose the FCD

Lower bills, same water use

The FCD corrects meter over-reading caused by air and turbulence. You keep using water the same way and pay for less.

Savings start right away

Savings appear on the very next water and sewer billing cycle. There is no ramp-up or waiting period.

No disruption to operations

Pressure loss is negligible, so downstream equipment and production are not affected. Install takes about an hour.

Certified and made in the USA

IAPMO, NSF, ANSI/CAN 61, KIWA, GMP and SQF certified. Built from 316L stainless steel in the USA.

Low-risk to try

6-month money-back guarantee with no questions asked, plus a lifetime transferable warranty. Installation cost is not refundable.

Proof for ESG and LEED

Documented water and sewer savings you can use for ESG reporting, LEED certification and sustainability programs.

How the Flow Conditioning Device manages your water costs

Air, bubbles and turbulent flow push your water meter to register more than you actually receive. The FCD installs in-line right after the meter, on your side of the connection, and creates smooth laminar flow. Your meter reads what you really use, so both your water charge and your sewer discharge fee drop.

Every FCD is custom-made for your pipe size, water pressure, install location and how your facility runs. It works with any meter type, so there is nothing to replace on the utility side.

  • Sizes NPS 1/2" to 12" (DN20-DN500), fits any pipe size and any meter type
  • 316L stainless steel standard; titanium and specialty alloys on special order
  • Four-component design: air and gas separation, pressure regulation, check valve (select models) and turbulence elimination
  • Handles cooling tower makeup, CIP cycles, irrigation zone cycling, tank fills and pressure cycling
  • Installed immediately after the water meter, usually in about an hour
  • Available to buy or lease, with volume rollouts for multi-site operators
  • Price range $799 to $44,999 depending on pipe size
  • Steam system assessment, trap survey and repair also available to cut water, sewer and fuel costs

Get My Free Analysis

How the Flow Conditioning Device manages your water costs

What happens next

  1. Send your bills

    Share recent water and sewer bills and a few facility details. The review is remote, so no site visit is needed.

  2. Get your savings analysis

    We check for meter over-reading, project your savings range, recommend FCD sizing and estimate your ROI. It is free with no commitment.

  3. Decide and install

    If it makes sense, choose purchase or lease. Turn-key installation takes about an hour for straightforward setups.

Frequently asked questions

How much does the FCD cost?

Pricing runs from $799 to $44,999 depending on pipe size. Each unit is custom-made to your facility, so your free savings analysis includes the right size and an ROI estimate.

Do you charge for the water bill review?

No. The bill review and savings analysis are free and carry no commitment. On-site visits, if you request one, are billable.

Will this slow down our water or hurt equipment?

No. Negligible pressure loss is a core design feature. In rare cases a few psi drop at the meter has been recorded, and downstream operations are not affected.

How soon will we see savings?

Savings appear on the very next water and sewer billing cycle after installation. There is no ramp-up period, and 90% of customers reach ROI in under 12 months.

What if it does not work for us?

There is a 6-month money-back guarantee with no questions asked on the FCD. Installation cost is non-refundable. A lifetime transferable warranty is included.

Do you serve our area and our facility type?

We serve commercial and industrial facilities across the United States, from plants and hospitals to hotels, schools, HOAs, data centers and car washes. Sales are B2B only.

See what your facility could save

Send us your water and sewer bills for a free review. You get a savings projection, FCD sizing and an ROI estimate with no commitment.

  • Cut water and sewer bills 5-30% with no change to operations
  • Savings show up on your very next billing cycle
  • 90% of customers reach ROI in under 12 months

Prefer to talk? Call 1-(844)-934-8258

What kind of property or facility are you looking at?

Your details go only to Water Flow Innovation to answer your request. No spam. Privacy policy

Get your free water bill review

Tell us about your facility. We review your water and sewer bills and show your savings range at no cost.

What kind of property or facility are you looking at?

Your details go only to Water Flow Innovation to answer your request. No spam. Privacy policy

Call Get My Free Analysis